Project Boundary

Maintained Illuminance Schedule Builder

Build a maintained-illuminance schedule from space, task plane, target, UF, and MF assumptions.

Inputs

Schedule spaces

Add one row for each relevant space, item, zone, document, or measurement set.

Row 1
Row 2

Results

Space count --
Total area -- m2
Area-weighted target -- lux
Total required initial lumens -- lm
Schedule status --
Schedule rows --
Calculation details
Space count
--
Total area
-- m2
Area-weighted target
-- lux
Total required initial lumens
-- lm
Minimum maintenance factor
--
Schedule status
--
Schedule rows
--
Important notes
  • The schedule records maintained-illuminance assumptions for review and handoff; it is not certification.
  • AS/NZS 1680, NCC context, task classification, glare, uniformity, and emergency scope require professional review.

Formulas

  • \(\displaystyle \Phi_{\mathrm{initial,row}} = \frac{E_{\mathrm{maintained}} \times A}{UF \times MF}\)
  • \(\displaystyle E_{\mathrm{weighted}} = \frac{\sum E_i A_i}{\sum A_i}\)

Build a maintained-illuminance schedule from space, task plane, target, UF, and MF assumptions.

Maintained Illuminance Schedule Builder is a planning aid. Keep the target source, product data, measurement method, and project assumptions with the result. Confirm compliance, installation, certification, and safety decisions with the responsible professional.